JOHN FITZGERALD KENNEDY
August 14, 2011 Leave a Comment
I can’t be exactly sure when I did this drawing and the essay that accompanied it. But, based on my creative spelling (and the way I referred to “Nov. 22″ without specifying a year), I’d guess that I produced it within a few months of the Kennedy assassination in 1963. So, I would have been — nine, maybe? Something like that.
I’m not sure where I got my “facts.” Clearly, I can’t blame the Internet for my unique historical perspective. (Oh, yeah, that’s right — I was nine. Maybe we should think of our current Web-heavy information age as “The Nine-ification of America.”)
In case you can’t read my handwriting, here’s what I wrote:
John Fitzgerald Kennedy 1917-1963
President Kennedy was assasinated Nov. 22 while riding through Dallas, Texas. Mrs. Connally had just said to Mr. Kennedy, “You can’t say Dallas isn’t nice to you,” when the 3 fatal shots rang out. The first one hit the President in the head, the next went into Gov. Connaly’s arm, hand and leg and the next one went into the Presidents neck. Presedent Kennedy slumped into his wifes arms while she shouted “oh no”. Mrs. Kennedy crawled on the trunk of the motorcade, shouting for a secret service man. At this, the car sped off toward the hospital with the wounded president. He was pronounced dead at 1 p.m. that afternoon. Then, Sunday Lee Harvey Oswald, acused assasin of the president was shot in the lower abdomen as he was being taken from the jail. He was shot by Jack Rubenstein, a night club owner.
Ask not what your country can do for you, but what you can do for your country.

