GROWING UP LAUGHING
September 28, 2010 Leave a comment
One of my caricatures (of Stephen Colbert) is included in the new book by Marlo Thomas, “Growing Up Laughing: My Story and the Story of Funny” (Hyperion).
The back cover of the book also features a thumbnail of the Colbert caricature, together with the work of the other contributing artists Tim Foley, Chris Galvin, Bob Kurtz, Chris Morris, Stephen Silver, Brian Smith, Taylor Smith and Zach Trenholm.
Follow Marlo on Twitter at @Marlo_Thomas.